A Ecology park on Greenwich
peninsula
English Partnerships

B Tottenham Hale Station
John Lyall Architects


C Overview of Thames Barrier
Park, Silvertown
Patel Taylor
Mayoral
strategies

Spatial Development
Strategy

The Greater London Authority can:

• Ensure that design quality is a key criteria in
assessing planning applications.

• Examine how the evaluation of architectural and urban design quality could be improved in the planning process. For example:

• planning applications with an impact on the wider community should be required to place proposals in the context of the locality, the district and the city as a whole, showing how a proposal contributes to the existing public realm and relates to the local environment.

• there should be closer integration between infrastructure, landscaping and urban development.

• design considerations should be an integral part of the early planning stages of projects.




• Review the availability of architectural and urban design skills within the planning system.

• a report should be undertaken on how building control consultancy can be improved

Scrutinise proposals for public participation in the planning process – what really leads to accountable design.

Establish a mechanism for exchanging information between planning authorities on latest thinking and techniques.

Undertake a survey and maintain a register of sites for urban development.

Publish guidance on how to achieve high quality, sustainable design solutions for local area renewal.

Provide seed funding for local area renewal schemes.
A B C